CE DanışmanıCE DanışmanıCE DanışmanıCE Danışmanı
  • CE Marking
    • CE Technical File
    • Machinery Regulation 2023/1230
    • Low Voltage Directive
    • EMC Directive
    • Machinery Risk Assessment (EN ISO 12100)
    • EN ISO 13849-1
    • CE Marking Consultancy
    • Machinery CE Marking
  • Testing
    • LVD Testing
    • EMC Testing
    • RoHS Testing
    • IP Testing (EN 60529)
    • Noise Emission Testing
    • Toy Testing
    • Medical Device Testing
  • Regulations
    • Pressure Equipment (PED)
    • ATEX
    • Medical Devices (MDR)
    • PPE
    • Toy Safety
    • Construction Products (CPR)
    • Lifts
    • Gas Appliances
    • Simple Pressure Vessels
    • Outdoor Noise
    • Ecodesign
    • Energy Labelling
    • Cosmetics
    • REACH
  • Standards
  • ISO
    • ISO 14001
    • ISO 45001
    • ISO 13485
    • ISO 22000
    • ISO 27001
    • ISO 50001
    • ISO 37001
    • ISO 10002
    • GMP (ISO 22716)
    • ISO/IEC 17025
    • ISO/IEC 17020
    • ISO/IEC 17021
    • ISO/IEC 17065
    • What Is Accreditation?
  • Export
    • EAC (Russia & EAEU)
    • GOST-R (Russia)
    • Ukraine
    • FDA (United States)
    • Halal
    • Kosher
    • Vegan
    • Food Contact Materials
  • Turkey
    • Import Inspection (TAREKS)
    • ÜTS Registration
    • UDI
    • Medical Device Sales Centre
    • Responsible Manager
    • Sales Representative Qualification
    • Production Input Exemption
    • Investment Incentive Certificate
    • Trademark Registration
  • Contact
    • About
Search
START TYPING AND PRESS ENTER TO SEARCH
  • CE Marking
    • CE Technical File
    • Machinery Regulation 2023/1230
    • Low Voltage Directive
    • EMC Directive
    • Machinery Risk Assessment (EN ISO 12100)
    • EN ISO 13849-1
    • CE Marking Consultancy
    • Machinery CE Marking
  • Testing
    • LVD Testing
    • EMC Testing
    • RoHS Testing
    • IP Testing (EN 60529)
    • Noise Emission Testing
    • Toy Testing
    • Medical Device Testing
  • Regulations
    • Pressure Equipment (PED)
    • ATEX
    • Medical Devices (MDR)
    • PPE
    • Toy Safety
    • Construction Products (CPR)
    • Lifts
    • Gas Appliances
    • Simple Pressure Vessels
    • Outdoor Noise
    • Ecodesign
    • Energy Labelling
    • Cosmetics
    • REACH
  • Standards
  • ISO
    • ISO 14001
    • ISO 45001
    • ISO 13485
    • ISO 22000
    • ISO 27001
    • ISO 50001
    • ISO 37001
    • ISO 10002
    • GMP (ISO 22716)
    • ISO/IEC 17025
    • ISO/IEC 17020
    • ISO/IEC 17021
    • ISO/IEC 17065
    • What Is Accreditation?
  • Export
    • EAC (Russia & EAEU)
    • GOST-R (Russia)
    • Ukraine
    • FDA (United States)
    • Halal
    • Kosher
    • Vegan
    • Food Contact Materials
  • Turkey
    • Import Inspection (TAREKS)
    • ÜTS Registration
    • UDI
    • Medical Device Sales Centre
    • Responsible Manager
    • Sales Representative Qualification
    • Production Input Exemption
    • Investment Incentive Certificate
    • Trademark Registration
  • Contact
    • About
Search

Production Input Exemption in Turkey (CE Exemption)

  • Ana Sayfa
  • Services
  • Production Input Exemption in Turkey (CE Exemption)
Satış ve Tanıtım Elemanı
Medical Device Sales Representative Rules in Turkey
October 1, 2026
Yatırım Teşvik Belgesi Almak Çok Kolay ve Çok Avantajlı
Investment Incentive Certificate in Turkey and TAREKS
October 1, 2026
CE Danışmanı
Kategoriler
  • Services
Etiketler
    Gümrük CE Muafiyet

    Gümrük CE Muafiyeti

    CE-marked products imported into Turkey are checked at customs through TAREKS, the risk-based import control system. Components that a manufacturer imports only to use in its own production do not have to go through this inspection each time. They can be covered by a production input exemption (üretim girdisi muafiyeti), often called the “CE exemption”. For a foreign company this matters in two situations: you run a factory in Turkey and import parts for it, or you supply components to a Turkish manufacturer and want your shipments to clear without inspection delays.

    For the production input exemption, apply to CE Danışmanı (CE Consultant); we manage the whole process for you.

    What the exemption does

    • Products imported as inputs for production are not subject to physical inspection under the import control communiqués.
    • The TAREKS reference number is obtained on the basis of the exemption, so the import procedure is shorter.
    • The exemption is granted for a year at a time and is limited by quotas for each product.

    It applies to products covered by the communiqué on import control of certain products that must bear the CE marking, and by the communiqué on import control of vehicle parts. The rules for the exemption are set by the Ministry of Industry and Technology.

    Who can apply?

    ApplicantCondition
    Industrial manufacturers in TurkeyThe product must be shown as a production input in the company’s capacity report.
    Suppliers that import on behalf of a manufacturerThe product must be shown as a production input in the capacity report of the manufacturer for which they import.

    A foreign supplier does not apply itself. The application is made by the manufacturer in Turkey, or by the supplier company in Turkey that imports for it. A foreign-owned manufacturing company established in Turkey applies like any other manufacturer.

    How to obtain the exemption

    1. Check the capacity report. The components to be imported must appear in it as production inputs. The applicant has to be able to show in which product each input is used.
    2. Apply to the provincial directorate. The application is made to the provincial directorate of the Ministry of Industry and Technology that issued the company’s industrial registry certificate.
    3. Annual exemption letter. If the application is accepted, a letter is issued to the importer. It lists each product by name and sets the maximum annual quantity for each customs tariff code (GTİP). If several products are imported under the same tariff code, a maximum annual quantity is set for each product.
    4. Define the document in TAREKS. Holding the paper document is not enough. The importer, or the importer’s authorised TAREKS user, has to enter it in the system. It becomes usable once the Ministry has approved it there.
    5. Use the quota. For each shipment the company makes its TAREKS application against the quota and receives the reference number under the exemption.
    6. Customs. The exemption letter is presented to the relevant customs offices by the manufacturer or its supplier.

    Points to watch

    • Quotas. Imports above the annual quantity are not covered. If production plans change during the year, the quantities have to be reviewed.
    • Product names and tariff codes. The description on the invoice and in the TAREKS application must match the exemption letter.
    • Use in production only. The exemption covers inputs for the applicant’s own production. The same product imported for resale goes through the normal TAREKS inspection, with the CE marking, the Declaration of Conformity and test reports.
    • Annual renewal. The exemption is given on a yearly basis and has to be requested again for the next year.

    Exemption or normal inspection?

    With production input exemptionWithout exemption
    Purpose of importInput for the importer’s own productionResale or any other purpose
    Inspection at importNo physical inspectionRisk analysis; documents and product may be inspected
    LimitAnnual quota per product and tariff codeNone
    BasisCapacity report and annual exemption letterCE marking, Declaration of Conformity, test reports

    The finished product still needs CE marking

    The exemption concerns the import inspection of the input. The product that the manufacturer builds with those inputs and places on the market must still comply with the legislation that applies to it. See CE marking and the technical file.

    How CE Danışmanı helps

    • Checking whether your products and your capacity report qualify
    • Preparing the application to the provincial directorate
    • Calculating and following the annual quotas by product and tariff code
    • Defining the exemption in TAREKS and supporting your customs broker
    • Preparing the conformity documents for products that fall outside the exemption

    Tell us about your company and the products you import, and we will reply with our offer as soon as possible.

    Message us on WhatsApp · info@cedanismani.com · Contact form

    Get an offer for your product

    Scope, timeline and price in three steps.

    1. 1Tell us about your productAttach a datasheet or photos if you have them
    2. 2Scope and tests become clearDirectives, tests, notified body
    3. 3Price and timeline in your handsOffer within one business day

    Prefer to talk now?

    WhatsAppE-mail

    Leave your details

    Reply within one business day

    Paylaş
    0

    Benzer Yazılar

    REACH Yönetmeliği

    REACH Yönetmeliği

    October 1, 2026

    REACH Regulation (EC) No 1907/2006


    Devamı
    ATEX Yönetmeliği

    ATEX Yönetmeliği

    October 1, 2026

    ATEX Directive 2014/34/EU


    Devamı
    Medikal yönetmeliği

    tibbi-cihaz-yonetmeligi

    October 1, 2026

    Medical Device Regulation (EU) 2017/745 (MDR)


    Devamı

    Contact

    +90 850 302 24 13

    Malte Business Center, Bağlarbaşı Mahallesi Atatürk Caddesi No:154 Maltepe / Istanbul, Turkey

    Get in touch

    Company

    • Contact
    • About
    • CE Marking
    • Machinery CE Marking
    • EMC Testing
    • Importing into Turkey (TAREKS)

    More

    • LVD Testing
    • RoHS Testing
    • EAC Certification
    • ISO 9001
    • Türkçe site

    CE belgesi logosu

    CE Danışmanı

    Doğru hizmeti sunmak, danışmanlık hizmetlerimizi ulusal ve uluslararası mevzuatlar ve güncel standartlar çerçevesinde geliştirmek için çalışıyoruz.

    © 2026 CE Danışmanı - All rights reserved.
    (0850) 302 24 13
    US
    • Türkçe
    • US
    Download the CE mark
    • Türkçe TR
    • English EN
    WhatsApp E-mail