EN 61000-4-11, “Electromagnetic compatibility (EMC) – Part 4-11: Testing and measurement techniques – Voltage dips, short interruptions and voltage variations immunity tests”, defines how to test the resistance of equipment to short drops and interruptions of the mains voltage. Laboratories call it the “dips test”; it is one of the basic AC power port tests in EMC testing.
Let us take care of EN 61000-4-11 testing and the CE marking of your product together; CE Danışmanı (CE Consultant) manages the whole process.

What does this test simulate?
A large motor starting on the network, the clearing of a nearby fault or a transformer switching operation lowers the voltage for a few cycles; sometimes the voltage disappears completely for a few hundred milliseconds. Equipment may restart, lose its memory or remain in an unsafe state. The test lowers and interrupts the mains voltage in a controlled way in the laboratory and records how the equipment behaves.
Three events are tried separately: a voltage dip of a defined depth and duration, a complete interruption, and a gradual voltage variation.
EN 61000-4-11 at a glance
| Current edition | IEC 61000-4-11:2020 (3rd edition, replacing the 2004 edition and A1:2017); applied in Europe as EN IEC 61000-4-11:2020 |
|---|---|
| Official title | Electromagnetic compatibility (EMC) – Part 4-11: Testing and measurement techniques – Voltage dips, short interruptions and voltage variations immunity tests |
| Type of standard | Basic EMC test standard: defines the test method; the class and the performance criterion are set by product and generic standards |
| Legislation | EMC Directive 2014/30/EU; harmonised product and generic standards refer to this test |
Which products does it apply to?
All electrical and electronic equipment connected to a 50 or 60 Hz AC network with a rated input current of up to 16 A per phase.
- For equipment above 16 A per phase the same tests are carried out under EN 61000-4-34.
- Equipment running only on batteries or a DC network is not tested; for adaptor-powered products the test is applied at the AC input of the adaptor.
- If the rated voltage range is wider than 20 % of its lower value, the test is run at both ends of the range.
Test setup

- Generator: the equipment is fed from a dip generator that can lower and restore the voltage instantly. The generator supplies 16 A per phase continuously and carries the inrush current of the equipment; a peak current capability of 500 A is required for 220-240 V mains.
- Transition: dips and interruptions start and end abruptly; the transitions are made at the zero crossing of the voltage, and the product standard may require additional phase angles between 45° and 315°.
- Repetition: each combination of level and duration is applied three times, with at least 10 s between events. Every representative operating mode of the equipment is tried.
- Three-phase equipment: interruptions are applied to all three phases at once; dips are applied to each phase-to-neutral and phase-to-phase voltage one at a time.
- Voltage variation: the voltage drops to 70 %, is held for one cycle and is brought back to the rated value gradually over 25 cycles; this shape imitates a motor start.
- Monitoring: the mains voltage is monitored to within 2 % throughout; the behaviour of the equipment is recorded for every event.
Test levels
| Event | Class 2 (public network level) | Class 3 (industrial in-plant point) |
|---|---|---|
| Voltage dip | 0 % for ½ cycle · 0 % for 1 cycle · 70 % for 25/30 cycles | In addition to class 2: 40 % for 10/12 cycles · 80 % for 250/300 cycles |
| Short interruption | 0 % for 250/300 cycles | 0 % for 250/300 cycles |
| Voltage variation | abrupt drop to 70 %, 1 cycle, recovery over 25/30 cycles | |
The percentages are the remaining voltage: a 70 % dip means the voltage falls to 70 % of its rated value. “25/30 cycles” means 25 cycles at 50 Hz and 30 at 60 Hz. For equipment connected directly or indirectly to the public network, no level less severe than class 2 may be chosen; class 1 is for protected supplies (behind a UPS) and its levels are set product by product.
Performance criteria
- A: the equipment works normally within its specified limits, also during the event.
- B: temporary degradation that recovers by itself. The generic standards require this criterion for short dips.
- C: temporary loss of function that needs user action or a restart. Accepted for long dips and interruptions; the operation of protective devices in electronic power converters also falls under this criterion.
- D: damage to hardware or software, or loss of data. The test is failed.
The equipment must not create a hazardous situation when it restarts after an interruption; this is assessed together with the Low Voltage Directive safety evaluation.
Place in the CE marking process
- The EMC standard of the product is identified; the class, the durations and the performance criterion are read from it.
- DC link capacitors, the hold-up time of the power supply and the restart behaviour of the firmware are reviewed during design; a pre-test is run if needed.
- The test is carried out in an accredited laboratory; the report records the operating modes, the phase angles and the observed behaviour.
- The report goes into the technical file; the EU Declaration of Conformity under the EMC Directive is drawn up and the product is CE marked.
Standards applied together
- EN 61000-4-4: electrical fast transient (burst) immunity
- EN 61000-4-5: surge immunity
- EN 61000-4-6: conducted RF immunity
- EN 61000-6-1 and EN 61000-6-2: generic immunity for residential and industrial environments
Frequently asked questions
What is the difference between a dip and an interruption?
In a dip the voltage does not fall to zero; it drops to a defined percentage of the rated value for a defined time (for example 70 % for 25 cycles). In an interruption the voltage is cut completely; in the standard this lasts 250 cycles, that is 5 seconds at 50 Hz. Dips test the hold-up time of most equipment, interruptions test its restart behaviour.
My product switches off during the interruption; is that a failure?
No. Switching off during a 5 second interruption is the expected behaviour; the generic standards accept criterion C for interruptions. What matters is that the equipment does not remain in a hazardous state and recovers as the user would expect when the voltage returns. For short dips, self-recovery (criterion B) is required.
What if my product fails?
Usually the hold-up time of the power supply is extended (a larger DC link capacitor), the undervoltage detection threshold and the restart sequence of the firmware are adjusted, and the hold-in behaviour of relays and contactors is reviewed. The test is then repeated with the same combinations.
Other standards in this group
- EN 61000-4-5: Surge Immunity Test
- EN 61000-4-6: Conducted RF Immunity Test
- EN 61000-4-2: Electrostatic Discharge Immunity Test
- EN 61000-4-3: Radiated RF Field Immunity Test
Our EMC test requirements tool shows which EMC tests your product needs in a few questions.